Workflow

Future Horizon (established2021) has been deployed further lots of projects for many types of businesses. The heart of success lies 6-step process framework Standardize and ensure each stage has specific measurement indicators.


Why is a standardized consulting process needed?

  • Save time – reduce trial‑error loops.
  • KPI transparency – easy to monitor, report and adjust.
  • Reduce risk – Small pilot before scaling up.
  • Knowledge transfer – Documents & detailed instructions help the team operate on their own.

Overview of 6 steps CONSULTING SERVICES

StepReference timeTargetDelivered products
1. Field survey5–7 days360° data collectionCurrent status report & raw dashboard
2. In-depth analysis10–12 daysDetermine the root causeRoot‑Cause Map, SWOT matrix
3. Propose strategy7 daysBuild Blueprint & KPI12-month roadmap, target index
4. Pilot4–8weeksTest the hypothesisReport results and recommend improvements
5. Comprehensive implementation3–6monthsReplicate & achieve KPIDetailed SOP, team training
6. Post-deployment (Hypercare)90daysStable & continuously optimizedRealtime dashboard, improvement plan


Step 1 – Field survey

Collect financial, operational, and market data; Interview all levels of personnel. The result is a clear status report, helping both sides share a common perspective.

Step2 – In-depth analysis

Apply 5 Whys & Fishbone to find the root cause and separate costs accordingly ABC costing.

Step3 – Propose strategy

Design Blueprint including People – Process – Technology; set North‑Star KPI as a guideline for the implementation phase.

Step4 – Pilot

Choose a small scope (a part or product) to verify; Track >20 indicators, adjust before expanding.

Step5 – Comprehensive implementation

Standardization SOP, training personnel on-site and through the e‑Learning library; Deploying management software (ERP, CRM, OKR) according to the cloud computing model.

Step6 – Post-deployment (Hypercare)

24/7 support for 90 days; report by BI Dashboard weekly; Organize kaizen workshops every month to maintain improvement.


Benefits of applying the 6-step process

  • Shorten 30% Deployment time compared to manual methods.
  • Save costs by eliminating processes that do not create value.
  • Clear ROI: progress and results are both tied to quantitative KPIs.
  • Adapt quickly with market changes thanks to Agile architecture.

Frequently Asked Questions (FAQ)

Is this process flexible for small businesses?
Yes. Steps 2 and 3 can be combined, focusing on handling important “bottlenecks” first.

How are costs calculated?
Costs divided by stages: survey – analysis, strategy, implementation, post-deployment; Each part is transparent from the beginning.

How long does it take for a project to be considered complete?
When KPI reaches ≥90% of target and the system operates stably for ≥30 consecutive days.


Contact for consultation

📞 Hotline: 0325 1123 10
📧 Email: [email protected]
📅 Book: 30 minutes free consultation – response within 24 hours.

Giỏ hàng của bạn 0

Giỏ hàng hiện đang trống

Thanh toán
0