{"id":18400,"date":"2025-05-02T16:09:57","date_gmt":"2025-05-02T09:09:57","guid":{"rendered":"https:\/\/www.chantroituonglai.com\/quy-trinh-lam-viec"},"modified":"2026-08-01T15:12:46","modified_gmt":"2026-08-01T08:12:46","slug":"workflow","status":"publish","type":"page","link":"https:\/\/www.chantroituonglai.com\/en\/workflow","title":{"rendered":"Workflow"},"content":{"rendered":"\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p><strong>Future Horizon<\/strong> (established2021) has been deployed further <strong>lots of projects<\/strong> for many types of businesses. The heart of success lies <strong>6-step process framework<\/strong> Standardize and ensure each stage has specific measurement indicators.<\/p>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<h2 class=\"wp-block-heading\">Why is a standardized consulting process needed?<\/h2>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Save time<\/strong> \u2013 reduce trial\u2011error loops.<\/li>\n\n\n<li><strong>KPI transparency<\/strong> \u2013 easy to monitor, report and adjust.<\/li>\n\n\n<li><strong>Reduce risk<\/strong> \u2013 Small pilot before scaling up.<\/li>\n\n\n<li><strong>Knowledge transfer<\/strong> \u2013 Documents & detailed instructions help the team operate on their own.<\/li>\n<\/ul>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<h2 class=\"wp-block-heading\">Overview of 6 steps CONSULTING SERVICES<\/h2>\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Step<\/th><th>Reference time<\/th><th>Target<\/th><th>Delivered products<\/th><\/tr><\/thead><tbody><tr><td>1. Field survey<\/td><td>5\u20137 days<\/td><td>360\u00b0 data collection<\/td><td>Current status report & raw dashboard<\/td><\/tr><tr><td>2. In-depth analysis<\/td><td>10\u201312 days<\/td><td>Determine the root cause<\/td><td>Root\u2011Cause Map, SWOT matrix<\/td><\/tr><tr><td>3. Propose strategy<\/td><td>7 days<\/td><td>Build Blueprint & KPI<\/td><td>12-month roadmap, target index<\/td><\/tr><tr><td>4. Pilot<\/td><td>4\u20138weeks<\/td><td>Test the hypothesis<\/td><td>Report results and recommend improvements<\/td><\/tr><tr><td>5. Comprehensive implementation<\/td><td>3\u20136months<\/td><td>Replicate & achieve KPI<\/td><td>Detailed SOP, team training<\/td><\/tr><tr><td>6. Post-deployment (Hypercare)<\/td><td>90days<\/td><td>Stable & continuously optimized<\/td><td>Realtime dashboard, improvement plan<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><\/p>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<h3 class=\"wp-block-heading\">Step 1 \u2013 Field survey<\/h3>\n\n\n<p>Collect financial, operational, and market data; Interview all levels of personnel. The result is a clear status report, helping both sides share a common perspective.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Step2 \u2013 In-depth analysis<\/h3>\n\n\n<p>Apply <strong>5\u202fWhys<\/strong> & <strong>Fishbone<\/strong> to find the root cause and separate costs accordingly <strong>ABC costing<\/strong>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Step3 \u2013 Propose strategy<\/h3>\n\n\n<p>Design <strong>Blueprint<\/strong> including People &#8211; Process &#8211; Technology; set <strong>North\u2011Star\u202fKPI<\/strong> as a guideline for the implementation phase.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Step4 \u2013 Pilot<\/h3>\n\n\n<p>Choose a small scope (a part or product) to verify; Track &gt;20 indicators, adjust before expanding.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Step5 \u2013 Comprehensive implementation<\/h3>\n\n\n<p>Standardization <strong>SOP<\/strong>, training personnel on-site and through the e\u2011Learning library; Deploying management software (ERP, CRM, OKR) according to the cloud computing model.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Step6 \u2013 Post-deployment (Hypercare)<\/h3>\n\n\n<p>24\/7 support for 90 days; report by <strong>BI Dashboard<\/strong> weekly; Organize kaizen workshops every month to maintain improvement.<\/p>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<h2 class=\"wp-block-heading\">Benefits of applying the 6-step process<\/h2>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Shorten 30%<\/strong> Deployment time compared to manual methods.<\/li>\n\n\n<li><strong>Save costs<\/strong> by eliminating processes that do not create value.<\/li>\n\n\n<li><strong>Clear ROI<\/strong>: progress and results are both tied to quantitative KPIs.<\/li>\n\n\n<li><strong>Adapt quickly<\/strong> with market changes thanks to Agile architecture.<\/li>\n<\/ul>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions (FAQ)<\/h2>\n\n\n<p><strong>Is this process flexible for small businesses?<\/strong><br\/>Yes. Steps 2 and 3 can be combined, focusing on handling important &#8220;bottlenecks&#8221; first.<\/p>\n\n\n<p><strong>How are costs calculated?<\/strong><br\/>Costs divided by stages: survey \u2013 analysis, strategy, implementation, post-deployment; Each part is transparent from the beginning.<\/p>\n\n\n<p><strong>How long does it take for a project to be considered complete?<\/strong><br\/>When KPI reaches \u226590% of target and the system operates stably for \u226530 consecutive days.<\/p>\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n<h2 class=\"wp-block-heading\">Contact for consultation<\/h2>\n\n\n<p>\ud83d\udcde <strong>Hotline<\/strong>: 0325 1123 10<br\/>\ud83d\udce7 <strong>Email<\/strong>: info@chantroituonglai.com<br\/>\ud83d\udcc5 <strong>Book<\/strong>: 30 minutes free consultation \u2013 response within 24 hours.<\/p>\n<\/blockquote>\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 6-step implementation framework helps Future Horizons work transparently, leanly and measure results at each stage.<\/p>\n","protected":false},"author":1,"featured_media":14990,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-18400","page","type-page","status-publish","has-post-thumbnail"],"_links":{"self":[{"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/pages\/18400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/comments?post=18400"}],"version-history":[{"count":3,"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/pages\/18400\/revisions"}],"predecessor-version":[{"id":19192,"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/pages\/18400\/revisions\/19192"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/media\/14990"}],"wp:attachment":[{"href":"https:\/\/www.chantroituonglai.com\/en\/wp-json\/wp\/v2\/media?parent=18400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}